Sample Projects

ASRS open floor.jpg

Factory Automation

ASRS, Conveyor Systems, Robotic Material Handling Cell

I was assigned as PM several weeks after this difficult and challenging 30 week project was initiated. My post-project summary report highlighted several areas for potential improvement, including design/development methodologies, increased standardization, and greater accountability between engineering disciplines.

ASRS robot.jpg
proj labor hours.jpg.png
crane.jpg
proj financial - POs.jpg
proj hours breakdown.jpg
revised amplifier_edited.jpg

Automotive Redesign

Software Defined Audio

This project of automotive audio and infotainment investigated moving the signal processing from amplifiers to headunits or VCUs.  This revealed significant savings in hardware (BoM) and development costs, as well as reduction of in-house hardware variants, reliance on specific industry vendors, and lower program TCO.

function blocks.jpg
photos.jpg

Process Engineering & Cost Analysis

Commercial Vehicle Power Supply Units

This project involved a complete product tear-down, analysis of product design & manufacturing, comparing / contrasting competitive products, and implementing cost-effective design and assembly improvements.

report example - integrated power unit.jpg
report example - integrated power unit (0).jpg

Electric Vehicle E/E Reports

Automotive Engineering

I have worked on multiple vehicle tear-downs and created many comprehensive engineering reports, several of them over 1,000 pages. 

​

Disassembly, photography, component identification, system description, report creation, etc. all require coordination, communication, and dedicated effort. 


As always, the devil is in the details.

Tesla Model S report sales sample.jpg
progress 02.jpg
east exterior panorama 3 AAAAAAAAA.jpg

Material Handling System

ASRS, Pallet Racking, Smart Conveyor System

This Alabama project was star-crossed from the beginning: record rainfall delayed construction of the customer's new warehouse by many weeks. Working without water, electricity, or four walls on the building was initially the project's greatest difficulty. But then a global pandemic left work crews quarantined in Europe and California, as well as wreaking havoc with the material delivery schedule. Fun times!

IMG_0686.jpg
partial rack in building 2.jpg
IMG_0684.jpg
IMG_0683.jpg

Automotive Material Handling 

West Coast Automotive Assembly

Assembly expansion for a growing OEM in California, a state with many construction standards and regulations.

plant layout schematic_edited.jpg

Business Process Re-Engineering

Midwest High-Volume Manufacturer

Assist a large corporation control ballooning costs by improving processes and methods in production, service, and warranty claim handling.

Scope included:

  • Identify/define/analyze current processes

  • Identify and prioritize deficiencies and opportunities for improvement

  • Create optimized future processes

  • Analyze existing data; improve client’s ability to collect and analyze process and product data

business process re-engineering 2.jpg
business process re-engineering 1.jpg